| 57.4 (1) Minister's Directions to Contractor, Failure to Provide Competent Services - If the Minister is of the opinion that a contractor has failed to provide correctional services in a competent manner, the Minister may issue a direction to the contractor with respect to those services and require the contractor to report back on the implementation of the direction within the time and in the manner specified by the Minister. 2000, c. 40, s. 14. | ||
| (2) Same - The contractor shall comply with the direction and provide the report as required. 2000, c. 40, s. 14. |